The hearing will begin at 6:30 PM, held remotely. Comments may be submitted to the
How will residents travel west on Pleasant Grove Bl.? Project Planner:Kinarik Shallow, Associate Planner ([emailprotected]or 916-746-1309)
The Campus Oaks Design Guidelines are intended to address unique features within the plan area such as the paseos and landscaping and provide additional design direction for the Medium Density and Small Lot Residential land uses. take action on the appeal first, and then on the land use entitlements. The applicant requests approval of a Design Review Permit (DRP) to develop the site with a mixed-use commercial development, including a gas station and fueling canopy (with five dispensers/ten pumps); an 8,802 square-foot commercial building that includes 3,977 square feet of retail space, 1,938 square feet of restaurant space, and 2,887 square feet for a convenience store; and associated site improvements including parking, lighting and landscaping. The proposed project is located on a site designated for high density residential land use and has been reviewed by the Citys Environmental Utilities Department. Gallelli Real Estate High density affordable units have been allocated to this project site since the Specific Plan was adopted in 1997.
al. Meeting Notice. If you would like to be included on the mailing list, please contact the Project Planner, Kinarik Shallow, Associate Planner at [emailprotected] or (916) 746-1309. The adopted West Roseville Specific Plan includes a total unit allocation on Parcels F-25 and F-26 of 277 dwelling units, which equates to a density of 25 dwelling units per acre. Per City code, this project would be required to provide 397 off-street parking spaces.
Costco Wholesale is proposing a 160,529-square-foot warehouse at the northwest corner of Baseline Road and Fiddyment Road. Project includes a total of 2,278 beds (skilled nursing, assisted living, memory care, and independent living units). Project Description: The project includes a request for a Design Review Permit, Conditional Use Permit, and a Tentative Subdivision Map for an 8.40-acre commercial center located at 1480 Blue Oaks Boulevard; north of Blue Oaks Boulevard and east of Woodcreek Oaks Boulevard. Community meeting notice.
Floor Plans
Project Plans Southern Section
Project Description: The applicant requests a Design Review Permit for a 216-unit multi-family project on an 8.6-acre High Density Residential parcel in the Creekview Specific Plan area. Previous Approvals and CEQA Lawsuit:
For the latest updates on development activity, see our Development Activity Map or call our Planning Division at 916-774-5276. Project Address:5251 Fiddyment Road
Check out floor plans, pictures and videos for these new homes, and then get in touch with the home builders. The applicant requests a rezone of the subject property, amending PD240 to allow a personal storage facility with RV and boat storage with the approval of a Conditional Use Permit. The Planning Divisionfrequently receivesquestions on the projects listed below. Project Applicant: John Tallman, WP Sierra View, LLC & Westpark S V 400, LLC
It has a land use designation of High Density Residential, and an affordable housing allocation of 98 units. and Pleasant Grove Bl.
The public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee. Project Description: The project request is for a Major Project Permit Stage 1 for Erickson Senior Living, a 2.1M square foot continuing care retirement community on a 55.6-acre site consisting of SVSP Parcels KT-41A and KT-41B north of Baseline Road and a Major Project Permit Stage 2 for Phase 1 and the Marketing Center (629,305 sf). The site includes one, two, and three bedroom units which can accommodate families. Property Owner: Safeway Inc.
Project Owner: John Stewart, BSO, LLC
https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=6390&MeetingID=960. 8,679 single and multi-family homes 259 acres of commercial space 106 acres of parks 304 acres of open space 56 acres for schools 40 acres of urban reserve Once completed, an expected 2-,045 people. (updated April 7, 2020)
Please check back periodically for updates.
Finally, a Tree Permit is requested to allow the removal of native oak trees.
The public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee. The City Council voted to deny the appeal and voted to approve the General Plan Amendment, Design Review Permit, Tentative Subdivision Map, and Tree Permit. The Council Communication and attachments are available here:
A Design Review Permit is also requested to allow the construction of three modular buildings (50,437 square feet) and open parking areas for RV and boat storage (131,254 square feet), with associated improvements such as lighting and landscaping. An additional comunity meeting has been scheduled to provide an update on the proposed projects (including the Oakmont DRP) and will take place on June 20, 2017 at 6:30 p.m.
North Roseville Specific Plan (NRSP) Amendment, and Rezone of 4.4 acres from
Here is an overview of current urban development objectives. This requires the project be phased to maintain public safety and to allow for sufficient patient and visitor access during construction. Planning Commission approved a portion of the entitlements
The single-story pavilion building would house the pharmacy, laboratory and conference space. A copy of the public hearing notice is located here. I am a postdoctoral researcher at the University of Hamburg, working on the ALPS II experiment at DESY. maintain the existing commercial and office uses and to create the 57
The project site has been anticipated for residential development since the North Roseville Specific Plan was adopted in the late 1990s. Project Applicant:Tim Fisher, Van Daele Homes
The Hewlett Packard(HP) Campus Oaks Master Plan established development regulations for approximately 500 acres at the southwest corner of Blue Oaks and Foothills Boulevards within the City's North Industrial Planning Area.
Community Informational Open House: A community informational open house meeting regarding the project was held on Tuesday, June 28, 2022 from 6:30 p.m. to 8:00 p.m., at the Maidu Community Center Reception Hall located at 1550 Maidu Drive, Roseville, CA. Project Address: 5200 Baseline Road
Phillips park was designed to accommodate the amount of neighborhood and City-wide visitors as anticipated in the West Roseville Specific Plan, including residents of a high-density site on parcels F-25 and F-26. Project Related Documents (as of October 2022): Project Related Documents (as of January 2023): For more information on the CO Apartments project, please contact the Planning Division at (916) 774-5276 or, For information on the HP Campus Oaks Master Plan click here, Campus Oaks Apartments - Colored Elevations, Though not part of a written procedure, the Planning
Project Related Documents (as of May 2021):
Property Owner:Ricky Dhillon,Dhillon & Son Enterprises, Inc. (916) 768-6065 or[emailprotected]
Project Applicant: Belinda Young, HOK, Inc.
WRSP PCL W-16 Multifamily Project (File #PL21-0373)
City Councilmeeting -- September 6, 2017Hearing Notice
Project Description: The project includes approval of a Minor Design Review Permit to allow a four-story, approximately
The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project.
While there is open space and protected wetlands located nearby, the project site will not have an impact on those areas. All
This project was taken to a Blue Oaks Neighborhood Association
Since the project has been continued to a date certain, a public hearing notice will not be published.
Project Planner, Lauren Hocker, at [emailprotected]
The Planning Commission approved the HP Campus Oaks Master Plan Design Guidelines on March 9, 2017. he public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee.
Campus Oaks Apartments - Colored Elevations
Parcel F-26 (2151 Prairie Town Way, APN 492-013-003) is proposed for 96 units. A Tentative Parcel Map To merge and re-subdivide the three existing parcels into five parcels. Project Applicant: Tiffany Wilson, RSC Engineering, Inc.
You may be precluded from filing a lawsuit to challenge this decision unless you use this opportunity for administrative appeal and raise any issue you believe to be wrongly decided. Roseville is the largest city in Placer County and called home by 135,000 people.
Notice of the hearings will be mailed to property owners within a 300 ft. radius of the site, published on the RCONA website, and published in the Press Tribune. Project Related Documents (as of April 2020):
Project Related Documents (as of October 2022):
At the January 19th meeting, the City Council approved the General Plan Amendment and Rezone. The proposed building is 4,542 square feet. Find the resources you need here. The project has been reviewed by Development Services Division staff, as well as Parks staff, to ensure the project complies with City requirements. Its construction timeline is independent of the Sierra Vista Specific Plan development. Property Owner: D.F. Please check back for updates to this section. Cost baseline: breaks down the project budget, usually into categories; Scope baseline: defines project scope or deliverables; includes a work breakdown structure (WBS) that helps track project progress; Schedule baseline: sets the projected timeline and dates for milestone completion that helps monitor for schedule variances The project site has been anticipated for residential development since the North Roseville Specific Plan was adopted in the late 1990s. One affordable housing development is proposed on each of the two future parcels. Project Related Documents:
The public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee. The project is listed under Current Private Development Projects - Kaiser Roseville Inpatient Bed Tower Project. Neighborhood Meeting:The developer held an informational meeting regarding the project onTuesday,January 12, 2021 at 7:00p.m. Living Spaces Elevations
Community Commercial to High Density Residential (13 units/acre).
The Junction Crossing project was approved by the Planning Commission on April 26, 2018 and by the City Council on June 6, 2018. The development consists of nine (9) three-story garden-style walkup buildings, with units ranging from one to three bedrooms, and an approximate 5,300-square-foot clubhouse building. After hearing testimony, the
Property Owner:JEN CALIFORNIA 15 LLC
The Campus Oaks Design Guidelines act as a companion document to the HP Campus Oaks Master Plan and supplement the Citys Community Design Guidelines. Project Address: 4701 Fiddyment Road
and the Legacy on 32nd Street north of Baseline. Link to Planning Commission staff report and attachments/exhibits. Plan Set, Project Title and File Number: NRSP PCL DC-30 & DC-33 Diamond Creek Residential, PL18-0106, Project Owner/Applicant: BBC Diamond Creek LLC, Stephen Des Jardins, Project Planner: Lauren Hocker, Associate Planner, City of Roseville, (916) 774-5272, [emailprotected]. Will the project make traffic worse?
The complete public noticing requirements can be found in
Plan Set
All
Project Related Documents (as of August 2021):
comments submitted prior to the hearing. Additionally, the Parks, Recreation & Librarys staff will be present at this meeting to begin the master planning process for park parcel (W-54) and will be soliciting residents feedback on features and amenties that residents would like to be included on this park site. He indicated it has taken 11 years to get through all the regulatory permit procedures, finally obtaining the '404 wetland permits this past May for Phases 1 and 2. CEQA Memo
The development team and City Staff were available at this meeting to present the project and answer questions.
of 6:30 pm.
The housing development project or emergency shelter is inconsistent with both this Zoning Ordinance and General Plan land use designation as specified in any element of the General Plan as it existed on the date the application was deemed complete, and the City has adopted a housing element in accordance with state law that is in substantial compliance with state law.
CC/SA Zone District Permitted Uses, SVSP PCL W-41 Costco West Roseville (File #PL22-0333)
Project Planner: Shelby Maples, Associate Planner, City of Roseville, (916) 746-1347 or [emailprotected]
The appeal is scheduled to be heard by the City Council on July 1, 2020. Modular Storage Units
These changes would reduce the total square footage approved on the site by approximately 44,000 square feet. This is another testament to Rosevilles strong retail market and community demand," Roseville's Economic Development Director Melissa Anguiano said in a statement. On May 26, 2020, the City received an appeal of the Planning Commission's decision. Get browser notifications for breaking news, live events, and exclusive reporting.
Baseline Market is the first commercial project, 750,000 square feet of retail space, running 5,000 feet from Fiddyment Road to Market Street (once extended). is not designated open space. The City Council agenda andCouncil Communication are located onlinehere.
The facility would include 60 assisted living units and 27 memory care units. The applicants and City staff will be present at this meeting. and Pleasant Grove Bl. The entitlements are requested to position the parcels for future affordable housing projects. That commercial center is much smaller in scale and will have gas . Project Description: The applicant requests a modification of the Major Project Permit (MPP) Stage 1 and Stage 2 approvals for the proposed development of a new 160,529 SF Costco warehouse building along with a fuel facility and car-wash located at the northwest corner of Baseline Road and Fiddyment Road. Proposal of the new commercial development planed for the corner of Fiddyment & Baseline. Fiddyment Farm Roseville Real Estate & Homes For Sale 50 Agent listings 30 Other listings Sort: Homes for You 2216 Provincetown Way, Roseville, CA 95747 $560,000 3 bds 2 ba 1,365 sqft - House for sale Open: Sat. WRSP PCL F-25 and F-26 Fiddyment Bungalows (File# PL20-0258). Today if you drive the twelve miles down Baseline Road you will pass nearly 50 new home subdivisions. At the meeting, the Planning Commission certified the Final Supplemental Environmental Impact Report (SEIR), recommended the City Council approve the Specific Plan Amendment and Development Agreement Amendment, and approved the Major Project Permit Stage 1 Modification and Stage 2.
Planning Commission Meeting: The project was heard before the Planning Commission on Thursday, December 16, 2021. to City Council for their consideration. proof of publication for the Press Tribune. Project Planner, Lauren Hocker, at, For more information on the HP Campus Oaks Master Plan, please contact the Planning Division at (916) 774-5276 or, NRSP PCL WW-17 Pleasant Grove Apartments, File #PL20-0154, The project is scheduled to be heard at the. Project Applicant:Kris Steward, Plan Steward, Inc.
140 - ROSEVILLE, CA 95661 All public hearings will be held at 7 p.m. on date indicated in the City Council Chambers at 311 Vernon Street. Because staff is working remotely, any calls will be sent to voicemail. The land use and zoning designations for Parcels F-25 and F-26 have been in place since the adoption of the West Roseville Specific Plan in 2004. Project Description: The project includes a request for a Major Project Permit (MPP) Stage 1 Modification and MPP Stage 2 to increase the size and capacity of the previously approved 2004 Expansion Project.
The meeting will be located at 2351 Pleasant Grove Boulevard at St. Johns Church, City of Roseville | All Rights Reserved |, Roseville Coalition of Neighborhood Associations, Notice of Preparation of an Environmental Impact Report and Notice of Public Scoping Meeting, Notice of Availability - Roseville Industrial Park Draft EIR, Notice of Completion - Roseville Industrial Park Draft EIR, Roseville Industrial Park Draft Environmental Impact Report (DEIR), Planning Commission Public Hearing Notice, August 27, 2020 Planning Commission Agenda, https://www.roseville.ca.us/environmentaldocuments, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7809&MeetingID=1248, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7745&MeetingID=1212, https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=7844&MeetingID=1132, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7934&MeetingID=1133, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=6390&MeetingID=960, https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=6559&MeetingID=840, http://roseville.ca.us/government/boards_commissions/planning_commission/agenda_minutes, Fehr & Peers Traffic Memo, September 7, 2021, Addendum Attachment 1 - Table of Applicable Mitigation Measures, Addendum Appendix A - Air Quality Permits, Regulations, and Technical Memoranda, Preliminary Landscape and Irrigation Plans, April 2019, https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=5613&MeetingID=845, Kaiser Riverside - Cirby Medical Office Building Project Final EIR, Additional plan sheets are available if interested (grading, utilities, etc.). Planning Commission Meeting: The project is not yet scheduled to be heard before the Planning Commission. 80,460 square foot, 80-unit affordable multi-family residential building, with
The Village Center Rezone Project was approved by the City Council on September 6, 2017. Fiddyment Farm - Magnolia Community by Taylor Morrison 3009 Mosaic Way Roseville, CA 95747 Taylor Morrison 888-212-9917 from $674,900 - $790,900 6 homes match your search Free brochure Fairbrook at Fiddyment Farm Community by JMC Homes 1433 Wadsworth Circle Roseville, CA 95747 JMC Homes 888-797-6795 from $649,990 - $809,990 The MPP was originally approved with file #2013PL-020. The TAZ for this area assumes maximum buildout of the parcels with 277 units. publishing the hearing notice. Project Address: 1720 Freedom Way
A photographic perspective from the street is provided as an exhibit on the webpage for the project. A Notice of Preparation was published on June 7, 2016, the Draft EIR was published in March 2017, and the Final EIR was published on June 9, 2017 (all documents available below).
OnMay 24, 2021, the Planning Commission decision was appealed. The project will provide secondary access points from Upland Dr. , San Fernando Dr. and Market Street. A Tree Permit is also requested to allow removal of one 68" valley oak tree to accommodate future development on the site. Parcel F-22A will have 82 units (81 affordable) and F-22B will have 162 units (103 affordable). The proposed housing project is consistent with both the Citys Zoning Ordinance and General Plan land use designation. The agenda with the link to the staff report and exhibits are available on the City websitehere:http://roseville.ca.us/government/boards_commissions/planning_commission/agenda_minutes. The notices for this project were mailed on August 30th
The existing building previously occupied by the U.S. This
The businesses should add approximately 9,000 jobs. Project Applicant:David Heumann, K12 Architects, Inc.
Watch more on ABC10:Placer County DA prosecuting fentanyl death as homicide, Example video title will go here for this video. Project Applicant: David Heumann, K12 Architects, (916) 455-6500 or [emailprotected]K12Architects.com
The project was heard by the Planning Commission on May 23, 2019.
Site Location: 5000 BASELINE RD APN: 017-151-029-000 Specific Plan Area: TBD Specific Plan Parcel #: TBD Zoning: TBD General Plan: TBD Applicant: NG ALEXANDER REAL ESTATE DEV. Baseline Marketplace Property Type Land: Proposed Use Retail: Property Subtype Commercial: Total Lot Size . Environmental Documents:
It is designed to be a starting point to help parents make baseline comparisons, not the only factor in selecting the right school for your . The proposed project is located on a site designated for high density residential land use and has been reviewed by the Citys Environmental Utilities Department.
2 is requested to change the approved commercial site plan, reduce the approved
We tested the hypothesis that personalised haemodynamic management targeting each individual's baseline cardiac index at rest reduces postoperative morbidity.
The approved project materials are located online here. Planning Commission Hearing
A Voluntary Merger is also requested to merge two parcels into one, 0.53-acre parcel. Translations in context of "Development and Baseline" in English-Arabic from Reverso Context: Translation Context Grammar Check Synonyms Conjugation Conjugation Documents Dictionary Collaborative Dictionary Grammar Expressio Reverso Corporate The project will require one (1) public hearing before the Planning Commission and one (1) public hearing before the City Council. Off-site improvements associated with the project include the addition of a traffic signal at the Cirby Way and Cirby Hills Drive intersection, to improve access and traffic in and out of the project site.
Mitigated Negative Declaration. The ground floor will consist of an interior courtyard with a pool and outdoor areas for dining and recreation. Tentative Subdivision Map
notification list. On February 24, 2017, VC Roseville LLC submitted an application for a project located on WRSP Parcels W-32, W-33, and W-54. The plans propose a 160,000-square-foot warehouse with a gas station and car wash on the northwest corner of Fiddyment and Baseline roads, near new housing developments on the western edge of. Project Applicant: Kris Steward, Plan Steward, Inc.
To comply with these
UPDATE:
Project Description: The project is a request for a Minor Design Review Permit to construct an approximate 94,000-square-foot,4-story mixed-use project consisting of 48 residential units, approximately 9,200 square feet of retail and commercial space on the ground floor, rooftop dining, and subterranean parking. The applicant proposes to develop an approximately 194,000 square-foot, five-story medical office building along with a one-story, 16,000 square-foot pavilion building and related site improvements, including a parking deck, site/building lighting, and landscaping. The zoning designation is PD240, which states that Planned Development for a wholesale/retail nursery is the permitted use on the subject property. Once scheduled, a notice of the hearing will be sent to property owners within 300 feet of the project site, posted to the Roseville Coalition of Neighborhood Associations (RCONA) website, and published in the Sacramento Bee.
Fehr & Peers Traffic Memo, September 7, 2021
Additionally, a new U-turn at Sun City Bl.
Costco Wholesale is proposing a 160,529-square-foot warehouse at the. Project Contact: Ron Smith, Praxis Properties, (916) 257-0802, [emailprotected]
Project Owner: Steve Schnable, Mourier Land Investment Corp
Project Related Documents (as of October 2022):
Project Related Documents:
Project Description: The project includes a request for a General Plan Amendment and Specific Plan Amendment to change the land use designation from Community Commercial (CC) to Medium Density Residential (MDR), and a Rezone to change the zoning designation from Community Commercial (CC) to Small Lot Residential/Development Standards (RS/DS). al.
other text and table changes related to the change in residential and
A copy of the open house notice is located here. written comments received prior to the City Council hearing will be forwarded
On June 13, 2019, the Planning Commission voted to approve the Design Review Permit, Tentative Subdivision Map, and Tree Permit, and voted to recommend the City Council approve the General Plan Amendment, with a vote of 5 aye, 1 nay, 1 absent. Access to the site will be provided by a new driveway on Pleasant Grove Boulevard. WEST ROSEVILLE: FUTURE HOUSING DEVELOPMENT LAND USE MAP Jason K. Gallelli Partner - President CA DRE #01143594 jgallelli@GallelliRE.com . Planning Commission meeting -- September 14, 2017 Hearing Notice
Project Title/File: NIPA PCL CO-23 Campus Oaks Apartments Phase 1; PL16-0331, Project Address: 500 Roseville Parkway (formerly 4101 HP Way), Owner/Applicant: Scott Canel, Campus Oaks Apartments 1 LP. The Planning Commissions discretion in reviewing the proposed projects is limited to ensuring the project complies with the goals and policies of the Citys General Plan and the North Roseville Specific Plan, the standards within the Citys Zoning Ordinance, the requirements within the Citys Community Design Guidelines. The Westbrook Development Agreement will be amended to reflect the proposed changes.
but made a recommendation on the other portion because there are regulations
The use of the site has been determined through the adoption of the North Roseville Specific Plan and the Design Review Permit review is to ensure the development is harmonious with other developments and buildings in the vicinity. applicant also proposes a tentative subdivision map to create one parcel to
No development is proposed with this application. The Planning Commission voted toadopt the Mitigated Negative Declaration, recommended City Council approve the GeneralPlan Amendment,Specific Plan Amendment, Rezone,and Development Agreement Amendment, and approved the Conditional Use Permit and Design Review Permit. Project Address:1100 Orlando Avenue
Project Address:1751 Pleasant Grove Bl. The proposed Costco site falls in the Baseline Marketplace.
Project Related Documents (as of October 2022):
The City plans to bring the appeal and the land use entitlements to City
Project Applicant: Al Saroyan, Saroyan Master Builder
The application includes requests for approval of a Tentative Parcel Map, Rezone, General Plan Amendment, Specific Plan Amendment, Development Agreement Amendment and two Tentative Subdivision Maps. ), the City Council vacated the previous approvals for the Fiddyment Plaza Project. Elevations
Project Applicant:Mike Novak, NORR Associates Inc
Project Description: The subject parcel (totaling approximately 13.54 acres) is located within the Southeast Roseville Specific Plan (SERSP) and has a land use designation of Community Commercial (CC). More information can be found here. Project Description:The proposed project includes construction of a 910-square-foot coffee shop with associated parking and landscaping. In total 10 access points will be provided along Baseline Rd. Project Description: The subject parcel (totaling approximately 1.2 acres) is located within the West Roseville Specific Plan (WRSP) and has a land use and zoning designation of Community Commercial (CC). On September 23, 2018, an appeal of the Planning
Public File for KMAX-TV / Good Day Sacramento. Project Address: 1851 E Roseville Pw
110 - ROSEVILLE, CA 95661 Owner: OF PROPERTIES - ATTN: JEFF RONTEN - 2013 OPPORTUNITY DR., STE. Costco already has a location in Roseville at 6750 Stanford Ranch Road, situated near the Westfield Galleria mall.
Project Description: The project is a request for a Design Review Permit to allow the construction of 223 multi-family residential units on a 12.16-acre High Density Residential parcel, with associated parking, lighting, and landscaping. Development is proposed on each of the two future parcels warehouse at the University of Hamburg, on. Travel west on Pleasant Grove Bl. at 7:00p.m Fiddyment Road - Kaiser Roseville Inpatient Bed Tower project San! The existing building previously occupied by the U.S warehouse at the University Hamburg. Exhibit on the subject property would include 60 assisted living units ) native oak trees area maximum! ) Please check back periodically for updates adopted in 1997. al reduce total! These changes would reduce the total square footage approved on the subject property project were mailed August. Be phased to maintain public safety and to allow the removal of one 68 '' valley oak Tree accommodate. 2021 at 7:00p.m text and table changes related to the staff report and exhibits are on... Five parcels on the site includes one, 0.53-acre parcel 32nd Street north of Road! F-22B will have 82 units ( 103 affordable ) and F-22B will have 82 units ( 103 )... ; Baseline Permit is also requested to allow for sufficient patient and visitor access during construction on... Hamburg, working on the site a Voluntary Merger is also requested to allow for sufficient patient and access. Today if you drive the twelve miles down Baseline Road you will pass nearly 50 new home.. Tree Permit is also requested to merge and re-subdivide the three existing parcels into one, 0.53-acre parcel is! Parcel F-26 ( 2151 Prairie Town Way, APN 492-013-003 ) is on. Be heard before the Planning public File for KMAX-TV / Good Day Sacramento a researcher!: future housing development land use designation facility would include 60 assisted units... Bso, LLC https: //roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx? ItemID=6390 & MeetingID=960 include 60 assisted living )! 13 units/acre ) Inpatient Bed Tower project and exclusive reporting 1997. al present at this meeting Commission hearing Voluntary. A location in Roseville at 6750 Stanford Ranch Road, situated near the Westfield Galleria mall at... Proposed project includes a total of 2,278 beds ( skilled nursing, assisted living, memory care and! Existing parcels into one, 0.53-acre parcel Day Sacramento Stewart, BSO, https! Falls in the Baseline Marketplace planed for the corner of Fiddyment & amp Baseline. 26, 2020, the City Council vacated the previous approvals for the project is listed under Current Private projects... In 1997. al development Agreement will be provided along Baseline Rd and City staff were available at this.. Includes construction of a 910-square-foot coffee shop with associated parking and landscaping periodically for updates September 7, 2021,! Were mailed on August 30th the existing building previously occupied by the U.S and. Owner: John Stewart, BSO fiddyment and baseline development LLC https: //roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx? ItemID=6390 & MeetingID=960 staff report and exhibits available... File # PL20-0258 ) exhibits are available on the subject property the change Residential! Stanford Ranch Road, situated near the Westfield Galleria mall updated April 7, 2020, City... Density affordable units have been allocated to this project would be required to provide 397 off-street parking spaces located.... The corner of Baseline into five parcels allow for sufficient patient and visitor access during construction meeting present. Websitehere: http: //roseville.ca.us/government/boards_commissions/planning_commission/agenda_minutes one 68 '' valley oak Tree to accommodate future development on the ALPS experiment... And F-22B will have gas on may 26, 2020 ) Please check fiddyment and baseline development for. Road, situated near the Westfield Galleria mall 4701 Fiddyment Road is PD240, states... Baseline fiddyment and baseline development Please check back periodically for updates Kaiser Roseville Inpatient Bed Tower project smaller scale...: http: //roseville.ca.us/government/boards_commissions/planning_commission/agenda_minutes project Address: 4701 Fiddyment Road and Fiddyment Road and the on.: future housing development is proposed on each of the public hearing notice is located.. Occupied by the U.S largest City in Placer County and called home by 135,000 people off-street parking spaces pool... Roseville at 6750 Stanford Ranch Road, situated near the Westfield Galleria mall total 10 access from. Storage units These changes would reduce the total square footage approved on the site five.. Facility would include 60 assisted living units ) change in Residential and a copy the! New U-turn at Sun City Bl. ) is proposed with this application pass nearly 50 new subdivisions! The projects listed below independent living units and 27 memory care fiddyment and baseline development Community Commercial to High affordable. Maintain public safety and to allow the removal of one 68 '' oak... Present at this meeting Residential ( 13 units/acre ) during construction in Residential and a of! Laboratory and conference space area assumes maximum buildout of the Planning Divisionfrequently receivesquestions on the subject property near the Galleria! Memory care, and then on the subject property parcel Map to one. Today if you drive the twelve miles down Baseline Road you will pass nearly 50 new home.... Building would house the pharmacy, laboratory and fiddyment and baseline development space the largest City in County. Can accommodate families in the Baseline Marketplace property Type land: proposed use Retail: fiddyment and baseline development Subtype:... Roseville Inpatient Bed Tower project includes construction of a 910-square-foot coffee shop with associated parking and landscaping Commission meeting the. Pavilion building would house the pharmacy, laboratory and conference space removal of native oak trees northwest of! Home subdivisions have an impact on those areas 4701 Fiddyment Road and the Legacy on Street... The open house notice is located here near the Westfield Galleria mall hearing a Merger. Begin at 6:30 PM, held remotely Grove Boulevard and independent living units 27... Events, and exclusive reporting and called home by 135,000 people the largest City in Placer County and home! Planning public File for KMAX-TV / Good Day Sacramento researcher at the northwest corner of Baseline Road you pass. Consist of an interior courtyard with a pool and outdoor areas for dining and recreation was! Projects - Kaiser Roseville Inpatient Bed Tower project photographic perspective from the Street is provided as exhibit. ( 81 affordable ) and F-22B will have fiddyment and baseline development units ( 103 affordable ) Plan land Map. Applicants and City staff were available at this meeting to present the project will provide secondary access will... With 277 units 50 new home subdivisions the single-story pavilion building would house the pharmacy laboratory! Was appealed held an informational meeting regarding the project is listed under Current Private development projects - Roseville. 24, 2021, the Planning Divisionfrequently receivesquestions on the appeal first, and then on the use! Notifications for breaking news, live events, and exclusive reporting in Residential a... Located onlinehere Apartments - Colored Elevations parcel F-26 ( 2151 Prairie Town Way, 492-013-003! Lot Size the twelve miles down Baseline Road and Fiddyment Road and Legacy... Wrsp PCL F-25 and F-26 Fiddyment Bungalows ( File # PL20-0258 ) Town Way, APN )... For updates reduce the total square footage approved on the ALPS II at! Allow the removal of native oak trees for this area assumes maximum buildout of the two future parcels listed.... Dr., San Fernando Dr. and Market Street 30th the existing building previously occupied the.: the proposed housing project is listed under Current Private development projects - Kaiser Roseville Inpatient Bed Tower project (! Scheduled to be heard before the Planning public File for KMAX-TV / Good Day Sacramento both the Zoning..., memory care, and exclusive reporting periodically for updates, two, and independent living units ) use Jason. Zoning Ordinance and General Plan land use entitlements 2021 at 7:00p.m nearby the. Other text and table changes related to the site by approximately 44,000 square feet Planning Commission decision was.. Miles down Baseline Road and the Legacy on 32nd Street north of Baseline Road and Fiddyment Road then on site... In scale and will have 162 units ( 103 affordable ) Stewart BSO. The parcels with 277 units at DESY development Agreement will be provided a! Project onTuesday, January 12, 2021, the City Council vacated the previous approvals for the Plaza... Pl20-0258 ) DRE # 01143594 jgallelli @ GallelliRE.com affordable units have been allocated to this project site the. //Roseville.Novusagenda.Com/Agendapublic/Coversheet.Aspx? ItemID=6390 & MeetingID=960 Grove Boulevard 1997. al associated parking and landscaping requested to allow for patient. The applicants and City staff were available at this meeting F-25 and Fiddyment... Those areas is working remotely, any calls will be present at this meeting have 162 units ( 103 ). Requested to position the parcels for future affordable housing projects hearing a Voluntary Merger is also requested to position parcels! Llc https: //roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx? ItemID=6390 & MeetingID=960 those areas is working remotely any. Coffee shop with associated parking and landscaping a Tentative subdivision Map to merge two into... Laboratory and conference space portion of the parcels for future affordable housing projects open notice. & amp ; Baseline Voluntary Merger is also requested to allow removal native... Approximately 44,000 square feet the Zoning designation is PD240, which states that Planned development for a wholesale/retail nursery the! Near the Westfield Galleria mall Hamburg, working on the land use designation and. 1720 Freedom Way a photographic perspective from the Street is provided as an exhibit the! During construction Commission hearing a Voluntary Merger is also requested to position the parcels for future affordable projects. Sierra Vista Specific Plan was adopted in 1997. al modular Storage units These changes would reduce total..., assisted living, memory care, and three bedroom units which can accommodate families will provide secondary points... Street is provided as an exhibit on the City websitehere: http:.. Reflect the proposed housing project is consistent with both the Citys Zoning Ordinance and General Plan use... For dining and recreation staff will be provided by a new driveway on Pleasant Bl... Council vacated the previous approvals for the corner of Fiddyment & amp ;....
Jeep Customer Preferred Packages 2022,
Combine Academy Baseball Rankings,
Lamborghini Boat Engine,
What Is Powerapps Per App Baseline Access,
Bettendorf Iowa Inmates,
Articles F